For  the  communication  pipeline  trench  excavated
          separately, it is easy to cause the pipeline laying to be wavy   Air blowing lubrication differs from traditional cable
          and serpentine in the section with high groundwater level   lubrication. The traditional lubrication is to pass the cable
          as the field environment is complex, thus affecting the air   through a sponge container full of lubricant (using the
          blowing distance. Although the large pipeline diameter   traction technology). However, cables with lubricant will
          can offset some micro-bending caused by uneven trench   make the air blower’s driving wheel or belt slip. When
          bottom, too large pipeline diameter will increase the   cables enter the air blower’s pressure chamber, most of
          cost, so high laying quality of pipeline is essential for the   the lubricant will be wiped off or blown away. Although
          construction of air blowing cable laying.              sponge balls can be placed behind the lubricant to push
                                                                 it through the pipe, only front pipes can be properly
          3. Coefficient of Internal Friction of Pipeline        lubricated. Moreover, excessive lubricant can cause viscous
          The friction between pipeline and cable will affect the   resistance in pipes due to the residual lubricant. Meanwhile,
          air blowing laying, so adding lubricant to pipeline is also   sponge balls are likely to get stuck in the pipe if they are
          the key of air blowing laying. The air blowing effect of   too large. It is extremely important to use sponge balls of
          different lubricants is different, so it is very important to   the correct size and material. Therefore, during pipe run-
          select the proper lubricant. In most cases, lubricants are   through, operators must first run through the pipe before
          used to reduce friction between cable and pipeline. There   air blowing. This marks the successful completion of early-
          are two different friction values, namely fluid friction and   stage work for the air blowing laying and lays a solid
          boundary friction.                                     foundation for the air blowing work that will start soon.
                                                                 With the air blowing cable laying technology, we need
          Fluid friction or “thick film friction” mainly acts to the   to ensure the laying quality of pipelines in all respects,
          low tension area of pipeline, which is consistent with air   reasonably select pipes, and reduce the friction coefficient
          blowing. Under these conditions, the cable actually floats   of pipeline inner. This will greatly promote air blowing
          on the thick film of lubricant. The viscosity of lubricant   construction.
          plays a vital role in fluid friction, so it is preferred to use
          the lubricant of low viscosity and make the lubricating   III. Construction Cases of Air Blowing Cable
          layer as thin as possible. Another method to minimize   Laying
          friction is to increase the effective distance between cables   1. Project Overview
          and/or pipelines by adding more slots to the pipelines   Fujian primary trunk of China Telecom has adopted YOFC
          and cables (excessive lubricant can be squeezed into such   GYTS04-144B1.2 nylon-shielded 144-core cable with an
          slots). The fluid friction grows as the cable laying speed   outer diameter of 21.5 mm, and 211 reels of cables for a
          increases. We can see that friction always plays a dominant   total distance of 706 km have been produced under the
          role at a very high laying speed.                      contract.

          When the positive cable-pipe pressure is high, or when the   2. Onsite Conditions
          “thick film friction” is sufficiently small, the friction effect   40/33 silicon core pipes allowing air blowing cables are
          of the boundary or the “thin film” becomes important.   already laid along the entire Beijing-Taipei Expressway
          These factors are reflected in high tension areas and on   across  Fujian  Province  from  the  south  of  Pucheng
          curved pipes. Under higher lateral pressure, the lubricating   County to Longyan City, and five project teams from two
          layer is destroyed and fails. For this reason, the lubricant   construction companies were performing air blowing with
          needs to be optimized to adapt to the two types of friction.   Plumett equipment and domestic equipment.
          When the air blowing technology is used, it is crucial to
          keep the positive pressure at a sufficiently low level and   Fig 2
          minimize the fluid friction.

          The lubricant needs not only the best initial friction
          coefficient, but also to maintain its properties during cable
          laying. It must remain valid as time elapses. As we demand,
          the lubricant must maintain its properties for a long period
          to allow future removal of cables from the pipeline or
          meeting the “lubricating before cable laying” requirement.
          First, the lubricant should be firmly absorbed on pipelines
          and cables, instead of being easily wiped off. Second, the
          lubricant can be easily applied and spread along pipelines
          and/or cables. Finally, during air blowing, the lubricant
          must not foam in pipelines. As mentioned above, we     3. Construction Process
          can identify the quality of lubricants through some tests.   The organization of construction personnel at the air
          Lubricant reduces not only the friction coefficient between   blowing site includes 1 manager responsible for the onsite
          cables and pipelines but also the electrostatic charges in   project (assigned by each engineering bureau), 1 supervisor
          cables.                                                                                      continuing to page 45